SIMULATION SUCCESS STORIES

National Grid Predicts Underground Cable Performance with Simulation

Energy

David Scott, UK National Grid, United Kingdom

U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.

  •  /
1
Loading PDF...

Suggested Stories

Lighting the Way for Improved Synchrotron Vacuum Chambers at RadiaSoft

Lighting the Way for Improved Synchrotron Vacuum Chambers at RadiaSoft

One of the goals of the Argonne National Laboratory (ANL) is to increase the brightness of synchrotron beams for the ...

Designing Tidal Turbines That Are Safe for Marine Life

Designing Tidal Turbines That Are Safe for Marine Life

A guest blogger from Xi Engineering discusses how his organization is using acoustics simulation to study the impacts ...

Analyzing the LHC Magnet Quenches

Analyzing the LHC Magnet Quenches

Engineers and physicists at CERN go to great lengths to ensure that the high-power superconducting magnets that ...

Analysis of Subsea Umbilicals and Cables

Analysis of Subsea Umbilicals and Cables

JDR Cables designs-to-spec and manufactures subsea umbilical systems of cables and reelers for the oil and gas and ...