National Grid Predicts Underground Cable Performance with Simulation
David Scott, UK National Grid, United Kingdom
U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.
Suggested Stories
The Burning Need for Modeling
Riello Burners manufactures high-efficiency low maintenance burners for use in residential and commercial heating ...
Using Multiphysics Simulation to Prevent Building Damage
In addition to surviving normal winters, a strong building must be able to survive the worst winters expected in a 50 ...
Simulation Software Brings Big Changes to Cable Industry
The design and testing of high-voltage cables for terrestrial and submarine applications is paramount to Prysmian's ...
Optimization Slashes Energy Consumption in Silicon-Based MEMS CO2 Detectors
CEA-MINATEC is an international center for micro and nano-technologies which is funded by CEA, a French government ...