National Grid Predicts Underground Cable Performance with Simulation

Energy

David Scott, UK National Grid, United Kingdom

U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.

  •  /
1
Loading PDF...

Suggested Stories

Multiphase Flow Simulation Guides Wastewater Treatment Plant Design

Multiphase Flow Simulation Guides Wastewater Treatment Plant Design

To improve the health of the Dommel river, an aeration unit has been added to the Eindhoven wastewater treatment plant ...

Metamaterials Make Physics Seem Like Magic

Metamaterials Make Physics Seem Like Magic

Metamaterials are manufactured, structured materials that they can interact and manipulate wave phenomena such that ...

Graphene Paves the Way for Next-Generation Plasmonics

Graphene Paves the Way for Next-Generation Plasmonics

Alexander V. Kildishev, associate professor of electrical and computer engineering, is leading computational ...

Modeling Thermomechanical Fatigue in COMSOL Multiphysics®

Modeling Thermomechanical Fatigue in COMSOL Multiphysics®

You can analyze thermomechanical fatigue in COMSOL Multiphysics® using experimental data from fatigue testing and ...